7. The theory of constraints (TOC) scheduling approach is referred to as a. Drum-buffer-constraint b. Drum-rope-constraint c.
Question:
7. The theory of constraints (TOC) scheduling approach is referred to as
a. Drum-buffer-constraint
b. Drum-rope-constraint
c. Drum-buffer-rope
d. Drum-bottleneck-rope