The from-to Chart in the table below indicates the number of loads moved per 8hour day (above

Question:

The from-to Chart in the table below indicates the number of loads moved per 8hour day (above the slash) and the distances in ft (below the slash) between departments in a particular factory. Fork lift trucks are used to transport materials between departments. They move at an average speed = 275 ft/min (loaded) and 350 ft/min (empty). Load handling time per delivery is 1.5 min, and anticipated traffic factor = 0.9. Assume reliability = 1.0 and worker efficiency = 110%. Use an availability factor = 95% and worker efficiency = 110%. Determine the number of trucks required under each of the following assumptions:
(a) The trucks never travel empty; and
(b) The trucks travel empty a distance equal to their loaded distance.
The from-to Chart in the table below indicates the number
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Question Posted: