What is an as-built estimate? Why is one prepared?
Question:
What is an as-built estimate? Why is one prepared?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 60% (5 reviews)
An asbuilt estimate is a detailed assessment of the actual cost of a construction project based on the work that was completed rather than on the orig...View the full answer
Answered By
Paul Gituku
I am an experienced academic writer and business planner with over 7years of experience. I am well versed with different referencing styles including OSCOLA, Havard, Chigaco, MLA, APA Oxford turbian. AGLC among others. I can handle any type of assignment including dissertation, essays report, cousework, business plan, among others.
0.00
0 Reviews
10+ Question Solved
Related Book For
Construction Cost Estimating
ISBN: 9780367902681
1st Edition
Authors: John E. Schaufelberger, Len Holm
Question Posted:
Students also viewed these Business questions
-
Harley-Davidson: Preparing for the Next Century There are very few products that are so exciting that people will tattoo your logo on their body. Richard Teerlink, Retired CEO, Harley-Davidson In...
-
Nine-step approach to case analysis When working on cases and problems in your , it is recommended that you follow this nine-step approach: Skim the case. Read the case closely. Identify problems and...
-
What Is Your Advice? 1. What would you suggest to Tyler to improve the restaurants operational efficiency? Examine the businesss inputs, processing, and outputs. Formulate recommendations to...
-
An investment was made for $35,000 and and income of $3,000. The ending value of the investment was $34,000. The percentage return on the investment is closest to: 5.7%, 8.6%, 11.8%
-
Briefly explain why cold-worked metals are more susceptible to corrosion than noncold-worked metals.
-
A resultant force F is necessary to hold the balloon in place. Resolve this force into components along the tether lines AB and AC, and compute the magnitude of each component. Given: F = 350 lb...
-
Suppose Golf Magazine would like to do an article comparing the driving distances of various golf balls. Eight golfers were asked to hit Top Flite, Pinnacle, and Titleist golf balls with their...
-
Determine a hypothesis that the following data may address and perform a x2 test on the survey data. a. American Idol should be broadcast before 9 p.m. Agree 40 Neutral 35 Disagree 25 100 b....
-
Based on the information provided below for Nash Company prepare a statement of cash flows using the Direct and Indirect methods. Prepare the statements on this worksheet below the data provided....
-
Of all the price analysis methodologies that exist, which are the foundational methods. Longing & Shorting. Trading & Investing. Volume & sentiment. On-chain & Macroeconomic. Mean reversion &...
-
Would a project owner be allowed to see a lump sum GCs monthly cost forecast?
-
Who should prepare an as-built estimate?
-
What does the internal control system comprise, according to ISA 400?
-
Q13. The probability that Ryan will roll a three using a standard die is 1/6. Let Y = number of times that Ryan has to roll a die in order to roll the first three. What is the expected value for Y?...
-
1. The following are data for two IT projects for a new database system. Prepare a spreadsheet for two projects, using the following data. Amounts are in thousands of dollars. Calculate the NPV for...
-
The Matsui Lubricants plant uses the weighted-average method to account for its work-in-process inventories. The accounting records show the following information for a particular day: Beginning WIP...
-
James Cook, a production department worker, is paid on hourly basis at a rate of $15 per hour. James works 40 hours per week. Any time James works over 40 hours, it is considered as overtime and he...
-
You just started working as a Health Service Manager within one of the following healthcare industries. First, choose an industry below to discuss the questions that follow: Ambulatory Surgery center...
-
Two pipes are buried in the earth and maintained at temperatures of 200 and 100C. The diameters are 9 and 18 cm, and the distance between centers is 40 cm. Calculate the heat-transfer rate per unit...
-
Show that, given a maximum flow in a network with m edges, a minimum cut of N can be computed in O(m) time.
-
Explain how to record the application of overhead to products using activity-based costing.
-
Describe the three steps required to implement activity-based management.
-
How does activity-based management differ from activity-based costing?
-
Question 3 (24 marks) Wonderful Technology Company Limited sells computers and accessories. Data of the store's operations are as follow: Sales are budgeted at $400,000 for December 2019, $420,000...
-
Kratz Manufacturing Company uses an activity-based costing system. It has the following manufacturing activity areas, related cost drivers and cost allocation rates: Activity Cost Driver Cost...
-
You are a Partner with Fix-It Consultants and have been engaged in an advisory capacity with a software company, called MoveFast. The company is seeing a sharp decline in revenue, with the primary...
Study smarter with the SolutionInn App