Assume you found a conflict in the drawings for the NanoEngineering Building. The finish schedule on Drawing

Question:

Assume you found a conflict in the drawings for the NanoEngineering Building. The finish schedule on Drawing A10.01-TI shows the walls of conference room 291 to be off-white, but the interior elevation shown in Drawing A7.05-TI shows the walls to be light green, which will be more expensive and cause difficulty in providing a quality finish. Prepare an RFI to resolve the discrepancy.