9. 11.54 The delivered-equipment cost for setting up a production and assembly line for high-sensitivity, gas-damped accelerometers

Question:

9. 11.54 The delivered-equipment cost for setting up a production and assembly line for high-sensitivity, gas-damped accelerometers is $650,000. If the direct cost and indirect cost factors are 1.82 and 0.31, respectively, and both factors apply to delivered-equipment cost, the total plant cost estimate is approximately: 1. $2,034,500 2. $1,734,500 3. $1,384,500 4. $1,183,000

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Basics Of Engineering Economy

ISBN: 9781259683312

3rd Edition

Authors: Leland T. Blank, Anthony Tarquin

Question Posted: