Budget and Capacity Variances. Revchek Manufacturing bases its factory overhead on the flexible budget cost function of:
Question:
Budget and Capacity Variances. Revchek Manufacturing bases its factory overhead on the flexible budget cost function of:
\section*{Required:}
1. Calculate the rates for variable and fixed overhead that would be used to apply overhead to products.
2. Calculate the underapplied or overapplied overhead for the period.
3. Determine the following variances:
(a) Overhead budget variance.
(b) Overhead capacity variance.
4. How much of the budget variance is due to variable costs and how much to fixed costs?