An industrial engineer tests 4 different shop-floor layouts by having each of 6 work crews construct a
Question:
An industrial engineer tests 4 different shop-floor layouts by having each of 6 work crews construct a subassembly and measuring the construction times (minutes) as follows:
Test at the 0.01 level of significance whether the 4 floor layouts produce different assembly times and whether some of the work crews are consistently faster in constructing this subassembly than the others.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Probability And Statistics For Engineers
ISBN: 9780134435688
9th Global Edition
Authors: Richard Johnson, Irwin Miller, John Freund
Question Posted: