How many work cycles should be timed to estimate tire average cycle time to within 2 percent

Question:

How many work cycles should be timed to estimate tire average cycle time to within 2 percent of the sample mean with a confidence of 99 percent if a pilot study yielded these times (in minutes): 5.2, 5.5* 5.8, 5.3, 5.5, and 5.1?