Question

1 Approved Answer

4.2 The table below lists the work elements in minutes) to be performed on an assembly line and the precedence requirements that must be satisfied.

image text in transcribed

image text in transcribed

image text in transcribed

4.2 The table below lists the work elements in minutes) to be performed on an assembly line and the precedence requirements that must be satisfied. Annual demand for the product will be 70,000 units. The line will operate one shift at 1900 hours per year. Expected line efficiency (proportion uptime) is 92%. Repositioning time per cycle is 9 seconds. Manning level is 1.0 for all stations. The products will be moved through the line by a conveyor at a speed of 0.914 meters/min and all the stations are of equal length of 3.048 meters. Work element 1 2 3 4 5 6 7 8 9 10 11 12 13 Time (minutes) 0.4 0.7 1.1 1.1 0.8 0.3 0.9 1.2 1.0 0.5 0.8 0.3 1.4 Preceded by - - 1 1,2 2 3 4 5 5 6 7 8,9 10,11,12 4.2.6 Solve the balancing problem using the Kilbrige and Wester method. (14)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Edi Audit And Control

Authors: I. Walden, A. Braganza

3rd Edition

1855542080, 978-1855542082

More Books

Students also viewed these Accounting questions