Question
A manufacturer of flash drives for data storage operates a production facility that runs on three 8-hour shifts per day. The following contingency table shows
A manufacturer of flash drives for data storage operates a production facility that runs on three 8-hour shifts per day. The following contingency table shows the number of flash drives that were defective and not defective from each shift. A manufacturer of flash drives for data storage operates a production facility that runs on three 8-hour shifts per day. The following contingency table shows the number of flash drives that were defective and not defective from each shift.
Shift | Defective | Not Defective |
7AM-3PM | 7 | 113 |
3PM-11PM | 10 | 90 |
11PM-7AM | 4 | 76 |
Perform a hypothesis test to determine if the quality of the flash drive production and the production shift are independent variables using = 0.05.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started