Question
A new highway is to be constructed. Design A calls for a concrete pavement costing $85 per foot with a 20-year life;four paved ditches costing$55
A new highway is to be constructed. Design A calls for a concrete pavement costing $85 per foot with a 20-year life;four paved ditches costing$55 per foot each; and three box culverts every mile, each costing $7,000 and having a 20-year life. Annual maintenance will cost $1,800 per mile; the culverts must be cleaned every five years at a cost of $500 each per mile.Design B calls for a bituminous pavement costing $45per foot with a 10-year life;two sodded ditches costing $1.60 per foot each; and four pipe culverts every mile, each costing$2,150 and having a10-year life. The replacement culverts will cost $2,450 each. Annual maintenance will cost $2,700 per mile; the culverts must be cleaned yearly at a cost of $230 each per mile; and the annual ditch maintenance will cost $1.60 per foot per ditch.Compare the two designs on the basis of equivalent worth per mile for a 20-year period. Find the most economical design on the basis of AW and PW if the MARR is 6% per year.
LOADING...
Click the icon to view the interest and annuity table for discrete compounding when the MARR is 6%
per year.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started