Question
A production process at Brianna Bryant Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and
A production process at Brianna Bryant Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).
a. The process time of a station is the time to produce a given number of units (or a batch of units) at that workstation. Bottleneck time is the time of the longest process (the slowest workstation) in the system. Calculate the process time per unit for each station.
Part 3
The process time for
Sawing=
minutes per unit (round your response to two decimal places.)
Part 4
The process time for
Sanding=
minutes per unit (round your response to two decimal places.)
Part 5
The process time for
Drilling=
minutes per unit (round your response to two decimal places.)
Part 6
The process time for
Welding=33.3333.33
minutes per unit (round your response to two decimal places.)
Part 7
The process time for overall (all 3 stations) Assembly
=
minutes per unit (round your response to two decimal places.)
Part 8
What area is the bottleneck?
b. Bottleneck time is the time of the longest process (the slowest workstation) in the system. The bottleneck time of the overall system is?
minutes per unit (round your response to two decimal places.)
Part 10
c. Throughput time is the time it takes for a product to go through the production process with no waiting.
Part 11
The drilling operation occurs separately from, and simultaneously with, the sawing and sanding operations.
The time it takes for a product to go through the sawing and sanding operations is?
minutes (round your response to two decimal places.)
Part 12
The time it takes for a product to go through the drilling operation is?
minutes.
Part 13
The longest path through the production process goes through?
minutes (round your response to two decimal places.)
d. If the firm operates
12 hours per day, 20 days per month, what is the monthly capacity of the manufacturing process?
First calculate the total work time available per month.
20
days/month12
hours/day60
minutes/hour=
minutes/month (enter your response as a whole number.)
Part 15
Then divide the total work time available per month by the bottleneck time.
The capacity of this work
cell=
units/month (enter your response as a whole number.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started