Question

1 Approved Answer

An HVAC Contractor proposes to weather strip an office building and install improved controls. This will reduce ventilation rate to 10 CFM per occupant (a

An HVAC Contractor proposes to weather strip an office building and install improved controls. This will reduce ventilation rate to 10 CFM per occupant (a total of 1,600 CFM). Added costs for weather stripping and controls total $2,000. Estimate the first year return on investment if:

Current design is 2,970 CFM winter and 2,400 CFM summer. New design is 1,600 CFM both summer and winter. Annual full load heating hours are 1,600. Annual full load cooling hours are 1,400. Winter TD = 60F, summer TD = 20F; GD (grain difference = 40). Heating will be with the existing equipment, a 75%-efficient oil-fired furnace with $1.00 per gallon oil (140,000 BTU/gal.) Cooling will be with existing equipment with a SEER 8 electric chiller with electricity costs are $0.07/kWh. Add 20% for air handler fan energy

Step by Step Solution

3.45 Rating (155 Votes )

There are 3 Steps involved in it

Step: 1

Vanlindion e AAAod C t dor wentherati... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction to Management Science

Authors: Bernard W. Taylor

11th Edition

132751917, 978-0132751919

More Books

Students also viewed these Accounting questions

Question

Name the main ore mineral of lead and give its origin

Answered: 1 week ago