Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company in the previous exercise consisted of the following activities and costs: Setup (1,000
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company in the previous exercise consisted of the following activities and costs:
Setup (1,000 setup hours) | $148,000 |
Production scheduling (400 batches) | 64,000 |
Production engineering (60 change orders) | 120,000 |
Supervision (2,000 direct labor hours) | 56,000 |
Machine maintenance (12,000 machine hours) | 84,000 |
Total activity costs | $472,000 |
The following additional data were provided for Job 845
Direct materials costs | $8,000 |
Direct labor cost (5 Milling direct labor hours; | |
35 Finishing direct labor hours) | $2,000 |
Setup hours | 5 hours |
Production scheduling | 1 batch |
Machine hours used (25 Milling machine hours; | |
5 Finishing machine hours) | 30 hours |
Production engineering | 3 change orders |
a. Calculate the cost per unit of activity driver for each activity cost category.
Setup | $Answer per setup hour |
Production scheduling cost | $Answer per batch |
Production engineering cost | $Answer per change |
Supervision cost | $Answer per direct labor hour |
Machine operating cost | $Answer per machine hour |
b. Calculate the cost of Job 845 using ABC to assign the overhead costs.
Job 845 | ||
---|---|---|
Direct materials cost | $Answer | |
Direct labor cost | Answer | |
Manufacturing overhead costs: | ||
Setup costs | Answer | |
Production scheduling | Answer | |
Production engineering | Answer | |
Supervision | Answer | |
Machine operations | Answer | |
Total cost | $Answer |
c. Calculate the cost of Job 845 using a company-wide overhead rate based on machine hours. Round rate to two decimal places. Company-wide overhead rate $Answer per machine hour Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number, when needed.
Job 845Direct materials cost$Answer
Direct labor costAnswerManufacturing overhead cost:Answer
Total cost$Answer
d. Calculate the cost of Job 845 using a machine hour departmental overhead rate for the Milling Department and a direct labor hour overhead rate for the Finishing Department.
Milling Department manufacturing overhead$348,000
Finishing Department manufacturing overhead$124,000
Machine hours used
Milling Department10,000 hours
Finishing Department 2,000 hoursLabor hours used
Milling Department1,000 hours
Finishing Department1,000 hours
Round rates to two decimal places, if needed.
$Answer per Milling Dept. machine hour
$Answer per Finishing Dept. direct labor hour
Use rounded overhead rates calculated above for calculations below. Round cost answers to the nearest whole number, when needed.
Job 845Direct materials cost$Answer
Direct labor costAnswer
Manufacturing overhead costs:
Milling Department Answer
Finishing Department Answer
Total cost $Answer
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started