Question
Flexible Overhead Budget Leno Manufacturing Company prepared the following factory overhead cost budget for the Press Department for October of the current year, during which
Flexible Overhead Budget
Leno Manufacturing Company prepared the following factory overhead cost budget for the Press Department for October of the current year, during which it expected to require 13,000 hours of productive capacity in the department:
Variable overhead cost: | ||
Indirect factory labor | $111,800 | |
Power and light | 3,900 | |
Indirect materials | 40,300 | |
Total variable overhead cost | $156,000 | |
Fixed overhead cost: | ||
Supervisory salaries | $54,600 | |
Depreciation of plant and equipment | 34,320 | |
Insurance and property taxes | 21,840 | |
Total fixed overhead cost | 110,760 | |
Total factory overhead cost | $266,760 |
Assuming that the estimated costs for November are the same as for October, prepare a flexible factory overhead cost budget for the Press Department for November for 11,000, 13,000, and 15,000 hours of production. Round your interim computations to the nearest cent, if required. Enter all amounts as positive numbers.
Leno Manufacturing Company | |||
Factory Overhead Cost Budget-Press Department | |||
For the Month Ended November 30 | |||
Direct labor hours | 11,000 | 13,000 | 15,000 |
Variable overhead cost: | |||
Indirect factory labor | $ | $ | $ |
Power and light | |||
Indirect materials | |||
Total variable factory overhead | $ | $ | $ |
Fixed factory overhead cost: | |||
Supervisory salaries | $ | $ | $ |
Depreciation of plant and equipment | |||
Insurance and property taxes | |||
Total fixed factory overhead | $ | $ | $ |
Total factory overhead cost | $ | $ | $ |
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 5,600 units of product were as follows:
Standard Costs | Actual Costs | ||
Direct materials | 7,300 lb. at $5.00 | 7,200 lb. at $4.80 | |
Direct labor | 1,400 hrs. at $17.30 | 1,430 hrs. at $17.60 | |
Factory overhead | Rates per direct labor hr., | ||
based on 100% of normal | |||
capacity of 1,460 direct | |||
labor hrs.: | |||
Variable cost, $3.20 | $4,440 variable cost | ||
Fixed cost, $5.10 | $7,446 fixed cost |
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct materials price variance | $ | |
Direct materials quantity variance | ||
Total direct materials cost variance | $ |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct labor rate variance | $ | |
Direct labor time variance | ||
Total direct labor cost variance | $ |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Variable factory overhead controllable variance | $ | |
Fixed factory overhead volume variance | ||
Total factory overhead cost variance | $ |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started