Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the beginning of the year, it estimated that 43,000

Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the beginning of the year, it estimated that 43,000 direct labor-hours would be required for the period's estimated level of production. The company also estimated $517,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $2.00 per direct labor-hour. Harris's actual manufacturing overhead cost for the year was $679,612 and its actual total direct labor was 43,500 hours. Required: Compute the company's plantwide predetermined overhead rate for the year. (Round your answer to 2 decimal places.) Predetermined overhead rate per DLH Luthan Company uses a plantwide predetermined overhead rate of $22.20 per direct labor-hour. This predetermined rate was based on a cost formula that estimated $266,400 of total manufacturing overhead cost for an estimated activity level of 12,000 direct labor-hours. The company incurred actual total manufacturing overhead cost of $266,000 and 12,700 total direct labor-hours during the period. Required: Determine the amount of manufacturing overhead cost that would have been applied to all jobs during the period. Manufacturing overhead applied Mickley Company's plantwide predetermined overhead rate is $21.00 per direct labor-hour and its direct labor wage rate is $11.00 per hour. The following information pertains to Job A-500: Direct materials Direct labor Required: $ 210 $ 55 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 60 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.) 1. Total manufacturing cost 2. Unit product cost per unit Fickel Company has two manufacturing departments-Assembly and Testing & Packaging. The predetermined overhead rates in Assembly and Testing & Packaging are $17.00 per direct labor-hour and $13.00 per direct labor-hour, respectively. The company's direct labor wage rate is $19.00 per hour. The following information pertains to Job N-60: Testing & Assembly Packaging Direct materials Direct labor $ 365 $ 35 $ 133 $ 57 Required: 1. What is the total manufacturing cost assigned to Job N-60? (Do not round intermediate calculations.) 2. If Job N-60 consists of 10 units, what is the unit product cost for this job? (Do not round intermediate calculations. Round your answer to 2 decimal places.) 1. Total manufacturing cost 2. Unit product cost per unit 56 Newhard Company assigns overhead cost to jobs on the basis of 118% of direct labor cost. The job cost sheet for Job 313 includes $22,532 in direct materials cost and $10,100 in direct labor cost. A total of 1,350 units were produced in Job 313. Required: a. What is the total manufacturing cost assigned to Job 313? b. What is the unit product cost for Job 313? a. Total manufacturing cost b. Unit product cost

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions