Question
here are several possible heights at which the higher end of the bridge can be attached to the higher mountain. Fill in the table below
here are several possible heights at which the higher end of the bridge can be attached to the higher mountain. Fill in the table below to use 5 possible values for y, and calculate the resulting values for r. (5 points: 1 point for each line of the chart)
x | x2 | y | y2 | Slope (rise/run) | r |
0 | |||||
2.5 | |||||
5 | |||||
7.5 | |||||
10 |
Maximum slope of your bridge
For automobile safety, the maximum slope that a highway can have is 6%, or 0.06. A surveyor measures the angle from one edge of the ravine to the other and determines that your bridge should have a slope of 0.06.
You need to find the length of your bridge if it has a slope of 0.06. This will tell you how much pavement is needed for the bridge deck
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started