For a soil section, which was given in the figure, the ground water table was drawn down 2 m from the ground surface level.
For a soil section, which was given in the figure, the ground water table was drawn down 2 m from the ground surface level. The results of the consolidation test performed at the laboratory conditions are given in the table. 45 minutes was elapsed to achieve the 70% of the settlement at the laboratory for the same stress level. The height of the sample is 20 mm. Calculate the total consolidation settlement of the clay layer and the time needed to achieve the 70% of the settlement. Stress Level p (kN/m) Mc Silty Sand Yo= 18.0 kN/m 2.0m (kN/m) 25-50 3150 Y19.5 kN/m 1.0 m 50-100 3260 Clay 100-200 3970 y= 17.5 kN/m 7.0 m 200-400 4920 400-800 7930 Clayey Gravel U (%) 10 20 30 40 50 60 70 80 90 95 Time factor 0.008 0.031 0.071 0.126 0.197 0.287 0.403 0.567 0.848 1.163 Ty
Step by Step Solution
★★★★★
3.41 Rating (157 Votes )
There are 3 Steps involved in it
Step: 1
1 Initial stress on the clay layer Total overburden pressure Density of soil x Height of soil Densit...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3