last 3 digits=888 Q2. The figure below shows a deck slab needs to be designed for a bridge. If a prestressed road bridge is used

Q2. The figure below shows a deck slab needs to be designed for a bridge. If a prestressed road bridge is

last 3 digits=888

Q2. The figure below shows a deck slab needs to be designed for a bridge. If a prestressed road bridge is used with 400 mm thick with parallel post-tensioned cables, in each of which the force at transfer is 750 kN. The bridge is required to support a uniformly distributed applied load of 8+(W/600) (Last 3 digits of your id) kN/m, with tensile stress in the concrete not exceeding 0.80 N/mm at any time. Design the slab and assume 20% loss of prestress after transfer. Also calculate the number of steel wires used in each cable with the permissible stress of 1200 N/mm for 7 mm diameter steel wire. Assume the density of the concrete is 25 kN/m. 15 m WH 15 m 15 m 4.5 m 6 m

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Mechanics of Materials

Authors: James M. Gere, Barry J. Goodno

7th edition

495438073, 978-0495438076

More Books

Students also viewed these Civil Engineering questions

Question

What general trade-off is involved in waiting-line decisions?

Answered: 1 week ago