Question
last 3 digits= 888 Q1. a. An unsymmetrical I section prestressed concrete beam of top flange (350 X 60 mm) in size, bottom flange of
last 3 digits= 888
Q1. a. An unsymmetrical I section prestressed concrete beam of top flange (350 X 60 mm) in size, bottom flange of (200 X 60 mm), 60mm thickness of web and overall depth of 500 mm is prestressed with 18 numbers straight steel wires of 9 mm diameter located at a distance of 25 mm from the bottom of the soffit and 7 numbers of straight steel wires of 6 mm diameter located at a distance of 25 mm from the top of the beam. The wires were initially tensioned on the prestressing bed with an initial prestress of 8+(W/600) (Last 3 digits of your id) GPa. The length of the beam is 10 m. Calculate the total percentage loss of stress in the wires at top and bottom. Assume the beam is post tensioned beam and all the wires stressed simultaneously tensioned by using the following data: Relaxation of steel stress=4.5% of initial stress Shrinkage strain in concrete for post tensioning = 200 x 106 Creep Coefficient =1.6 Friction coefficient for wave effect-0.0015+0.001* (Last 3 digits of your id) per metre Slip at anchorage=1.5 mm Modulus of elasticity for steel = 210 GPa Modulus of elasticity for concrete= 35 GPa b. What are the measures that are suggested to be taken to reduce the losses in prestressed concrete members for the above problem?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started