Question: Material Requirements Planning 25.1 Using the master schedule of Figure 25.2(b), and the product structures in Figures 25.4 and 25.6, determine the time-phased requirements for

Material Requirements Planning 25.1 Using the
Material Requirements Planning 25.1 Using the
Material Requirements Planning 25.1 Using the
Material Requirements Planning 25.1 Using the master schedule of Figure 25.2(b), and the product structures in Figures 25.4 and 25.6, determine the time-phased requirements for component C6 and raw material M6. Lead times are as follows: for P1, assembly lead time is one week; for P2, assembly lead time is one week; for S2, assembly lead time is one week: for S3, assembly lead time is one week; for C6, manufacturing lead time is two weeks; and for M6, ordering lead time is two weeks. Assume that the current inventory status for all of the above items is zero units on hand, and zero units on order. The format of the solution should be similar to that presented in Figure 25.7. po babicon on the bottom Product browolvo P1 motor Subassembly S1 1625 S2 (2) (1) Component C1 C3 C4 (2) C5 (2) C6 (1) (1) port Material MM2 M3 M4 MS M6 102.00 (1) (1) (1) (1) ) (1) (.5) DOO DU Figure 25.4 Product structure for product P1. P2 S3 S4 (1) (1) C6 02 4 (1) S C7 (2) (2) (2) (1) M4 M8 M6) (.5) (1) M7M2 (1) (1) (1)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!