Morton Company's budgeted variable manufacturing overhead is $4.50 per direct labor-hour and its budgeted fixed manufacturing overhead is $270,000 per year. The company manufactures a single product whose standard direct labor-hours per unit is 2 hours. The standard direct labor wage rate is $15 per hour. The standards also allow 4 feet of raw material per unit at a standard cost of $8.75 per foot. Although normal activity is 30,000 direct labor-hours each year, the company expects to operate at a 40,000-hour level of activity this year. Required: 1. Assume that the company chooses 30,000 direct labor-hours as the denominator level of activity. Compute the predetermined overhead rate, breaking it down into variable and fixed cost elements. 2. Assume that the company chooses 40,000 direct labor-hours as the denominator level of activity. Compute the predetermined overhead rate, breaking it down into variable and fixed cost elements. 3. Complete two standard cost cards for 30,000 & 40,000 DLHS. 4. Assume that the company actually produces 18,000 units and works 38,000 direct labor-hours during the year. Actual manufacturing overhead costs for the year are: Variable manufacturing overhead cont Fixed manufacturing overhead cost Total manufacturing overhead cost $ 174,800 271500 5 446.400 a. Compute the standard direct labor-hours allowed for this year's production b. Complete the Manufacturing Overhead T-account below. Assume that the company uses 30,000 direct labor-hours (normal activity) as the denominator activity figure in computing predetermined overhead rates, as you have done in (1) above, c. Assume that the company uses 30,000 direct labor-hours (normal activity) as the denominator activity figure in computing predetermined overhead rates, as you have done in requirement (1) Complete this question by entering your answers in the tabs below. Regi Reg 2 Req3 Reg 4 Reg 40 Reg 4C Assume that the company chooses 30,000 direct labor-hours as the denominator level of activity. Compute the predetermined overhead rate, breaking it down into variable and fixed cost elements. (Round your answers to 2 decimal places.)