Answered step by step
Verified Expert Solution
Question
1 Approved Answer
PA4-1 (Algo) Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4, 4-6] Hazelnut Corp. manufactures lawn ornaments. It currently has two product lines,
PA4-1 (Algo) Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4, 4-6] Hazelnut Corp. manufactures lawn ornaments. It currently has two product lines, the basic and the luxury. Hazelnut has a total of $160,948 in overhead. The company has identified the following information about its overhead activity cost pools and the two product lines: Activity Cost Pools Materials handling Quality control Machine maintenance Cost Driver Number of moves Cost Assigned to Pool $ 3,648 Number of inspections Number of machine hours $ 29,900 $127,400 Quantity/Amount Consumed by Basic 25 moves] 240 inspections 5,000 machine hours Quantity/Amount Consumed by Luxury 51 moves 120 inspections: 4,100 machine hours Required: 1. Suppose Hazelnut used a traditional costing system with machine hours as the cost driver. Determine the amount of overhead assigned to each product line. (Do not round intermediate calculations and round your final answers to the nearest whole dollar amount.) 1. Suppose Hazelnut used a traditional costing system with machine hours as the cost driver. Determine the amount of overhead assigned to each product line. (Do not round intermediate calculations and round your final answers to the nearest whole dollar amount.) Basic Model Overhead Assigned Luxury Model Overhead Assigned 2. Calculate the activity rates for each cost pool in Hazelnut's ABC system. (Round your answers to the nearest whole dollar.) Materials Handling Quality Control Machine Maintenance Activity Rates per Move per Inspection per Machine Hour 3. Calculate the amount of overhead that Hazelnut will assign to the basic line if it uses an ABC system. (Round your intermediate and final answers to the nearest whole dollar.) Basic Model Materials Handling Quality Control Machine Maintenance Total Overhead Assigned $ 0 4. Determine the amount of overhead Hazelnut will assign to the luxury line if it uses an ABC system. (Round your intermediate and final answers to the nearest whole dollar.) Luxury Model Materials Handling Quality Control Machine maintenance Total Overhead Assigned $ 0 5. Compare the results for a traditional system with that of an ABC system. Which do you think is more accurate? O Traditional System O ABC System
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started