PA4-3 (Algo) Selecting Cost Drivers, Assigning Costs Using Activity Rates [LO 4-1, 4-3, 4-4, 4-6 ] Harbour Company makes two models of electronic tablets, the Home and the Work. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Home Work $ 38 $ 66 16 36 359 571 770 units 348 units Harbour has monthly overhead of $186,945, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 79,380 65,565 42,000 $186,945 The company has also compiled the following information about the chosen cost drivers: Number of setups Nunber of inspections Number of machine hours Home 44 340 1,200 Work Total 98 365 705 1,600 2,800 Required: 1. Suppose Harbour uses a traditional costing system with machine hours as the cost driver. Determine the amount of overhead assigned to each product line. (Do not round intermediate calculations and round your final answers to the nearest whole dollar amount.) Requireu. Suppose Harbour uses a traditional costing system with machine hours as the cost driver. Determine the amount of overhead assigned to each product line. (Do not round intermediate calculations and round your final answers to the nearest whole dollar amount.) Overhead Assigned Home Model: Work Model: Total Overhead Cost 2. Calculate the production cost per unit for each of Harbour's products under a traditional costing system. (Round your intermediate calculations and final answers to 2 decimal places.) Home Work Unit Cost 3. Calculate Harbour's gross margin per unit for each product under the traditional costing system(Round your intermediate calculations and final answers to 2 decimal places.) Home Work Gross Margin 4. Select the appropriate cost driver for each cost pool and calculate the activity rates if Harbour wanted to implement an ABC system. Setup Costs Quality Control Maintenance 5. Assuming an ABC system, assign overhead costs to each product based on activity demands. Overhead Assigned To Home Overhead Assigned To Work Setup Costs Quality Control Maintenance Total Overhead Cost 6. Calculate the production cost per unit for each of Harbour's products in an ABC system. (Round your intermediate calculations and final answers to 2 decimal places.) Home Work Unit Cost 7. Calculate Harbour's gross margin per unit for each product under an ABC system. (Round your intermediate calculations and final answers to 2 decimal places.) Home Work Gross Margin 8. Compare the gross margin of each product under the traditional system and ABC. (Round your answers to 2 decimal places.) Home Work Gross Margin (Traditional) Gross Margin (ABC)