Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Please help by using Excel, Please show the formula that was use for the calculation in excel so I can also input it correctly into

image text in transcribed

Please help by using Excel, Please show the formula that was use for the calculation in excel so I can also input it correctly into excel because without knowing where the formula is applied, I will have no clue where to start. Thank You

4. The Louisiana Department of Transportation and Development (LaDOTD) in 2009 approved the feasibility analysis for upgrading 6 miles of US-167 South starting at the intersection with US-80 (California Avenue). An existing two-lane highway between is to be converted to a four-lane divided freeway. The proposed new freeway is projected to average 25,000 vehicles per day over the next 20 years. Truck volumes represent 6.25% of the total traffic. Annual maintenance on the existing highway is $1875 per lane mile. The existing accident rate is 5.725 per million vehicle miles (MVM). Capital improvement investment money can be secured at 6.25%. Which alternative is preferred (use benefit/cost ratio analysis)? Plan 1: Add two adjacent lanes for $562,500 per mile. This will reduce auto travel time by 2.5 minutes and truck travel time by 1.25 minutes. It will reduce the accident rate to 3.125 per MVM. Annual maintenance is estimated to be $1560 per lane mile. Plan 2: Make grade improvements while adding two adjacent lanes at a cost of $812,500 per mile. This would reduce auto and truck travel time by 3.75 minutes each. The accident rate is estimated to be 3.10 per MVM. Annual maintenance is estimated to be $1250 per lane mile. Plan 3: Construct a new freeway on new alignment at a cost of $1,000,000 per mile. This would reduce auto travel time by 6.25 minutes and truck travel time by 5 minutes. Plan 3 is 0.5 miles longer than the others. The estimated accident rate is 3.00 per MVM. Annual maintenance is estimated to be $1250 per lane mile. Plan 3 abandons the existing highway with no salvage value. Additional data: Operating cost-autos: 15 por mila Workbook last saved: 6m ago Operating cost-trucks: 22.5 per mile Time saving-autos: 3.75 per vehicle minute Time saving-trucks: 18.75 per vehicle minute Average accident cost: $1500 4. The Louisiana Department of Transportation and Development (LaDOTD) in 2009 approved the feasibility analysis for upgrading 6 miles of US-167 South starting at the intersection with US-80 (California Avenue). An existing two-lane highway between is to be converted to a four-lane divided freeway. The proposed new freeway is projected to average 25,000 vehicles per day over the next 20 years. Truck volumes represent 6.25% of the total traffic. Annual maintenance on the existing highway is $1875 per lane mile. The existing accident rate is 5.725 per million vehicle miles (MVM). Capital improvement investment money can be secured at 6.25%. Which alternative is preferred (use benefit/cost ratio analysis)? Plan 1: Add two adjacent lanes for $562,500 per mile. This will reduce auto travel time by 2.5 minutes and truck travel time by 1.25 minutes. It will reduce the accident rate to 3.125 per MVM. Annual maintenance is estimated to be $1560 per lane mile. Plan 2: Make grade improvements while adding two adjacent lanes at a cost of $812,500 per mile. This would reduce auto and truck travel time by 3.75 minutes each. The accident rate is estimated to be 3.10 per MVM. Annual maintenance is estimated to be $1250 per lane mile. Plan 3: Construct a new freeway on new alignment at a cost of $1,000,000 per mile. This would reduce auto travel time by 6.25 minutes and truck travel time by 5 minutes. Plan 3 is 0.5 miles longer than the others. The estimated accident rate is 3.00 per MVM. Annual maintenance is estimated to be $1250 per lane mile. Plan 3 abandons the existing highway with no salvage value. Additional data: Operating cost-autos: 15 por mila Workbook last saved: 6m ago Operating cost-trucks: 22.5 per mile Time saving-autos: 3.75 per vehicle minute Time saving-trucks: 18.75 per vehicle minute Average accident cost: $1500

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Management Audits For Excellence

Authors: Dorsey J. Talley

1st Edition

0873890396, 978-0873890397

More Books

Students also viewed these Accounting questions