Question 1 The linked video, ABC for Everyday Bridges, presents an innovative technique of construction that minimizes public disruption and results in cost and time

  • Question 1

The linked video, "ABC for Everyday Bridges," presents an innovative technique of construction that minimizes public disruption and results in cost and time savings, as well as long-term operational and maintenance savings. What is the name of this construction technique, given the acronym "ABC"?
  • Question 2

5 out of 5 points

The CSI MasterFormat organizes the Specifications Group into five (5) Subgroups with a total of forty-nine (49) Divisions. Which of the following isnot one of the five Subgroups?
  • Question 3

0 out of 5 points

Because they must be submitted to the local approving authority, the A/E's work involved in creating a set of Permit Drawings is considerably more detailed, and thus takes much more time (and expense) than the creation of a set of Construction Documents.
  • Question 4

0 out of 5 points

In designing the project, the A/E must take into account Federal, State and local laws and regulations, which include all of the following EXCEPT:
  • Question 5

5 out of 5 points

Certification of a facility as "LEED Compliant" means that it meets the requirements of The United States Green Building Council, which certifies the sustainability of new, remodeled or existing facilities based upon their compliance with USGBCcriteria.
  • Question 6

5 out of 5 points

Specifications may either be written from scratch following CSI principles or be created by editing "master guide" specifications
  • Question 7

0 out of 5 points

Alternates are optional work items that may not be part of the contracted work, and include all of the following EXCEPT:
  • Question 8

5 out of 5 points

When a Standard Form Agreement is used, the A/E should incorporate the agreement by reference and not include the actual agreement form in the project manual.
  • Question 9

0 out of 5 points

In negotiating a 'cost-plus-fee' contract, the owner accepts the risk of not knowing the total cost until the contract is almost complete. To manage thisrisk, most owners and many lenders may require a ___________ to be included in the contract.
  • Question 10

0 out of 5 points

The Contract Documents include all of the following EXCEPT:
  • Question 11

0 out of 5 points

There are four types of Specifications (single or in combination) used to identify materials, methods and products for a construction project. Which one of the following isnotone of the four types:
  • Question 12

5 out of 5 points

The specifications, procurement (bidding) requirements, contracting forms and conditions of thecontract are compiled into a single set of documents called the
  • Question 13

0 out of 5 points

All of the following attributes is true of "Fast-Track" timing of a construction project EXCEPT:
  • Question 14

5 out of 5 points

Life cycle costs are the estimated expenses for a project based on the total cost of ownership, rather than just the initial cost.
  • Question 15

0 out of 5 points

Division 01 of the Specifications contains all of the following Parts (categories), EXCEPT:
  • Question 16

0 out of 5 points

Total Project Commissioning process
  • Question 17

2.5 out of 5 points

An owner may request all of the following types of bids or proposals for a construction job, EXCEPT:
  • Question 18

0 out of 5 points

Two types of agreements are usually executed during the construction of a project: 1) contracts (between the owner, A/E and contractor); and 2) __________ ___________ (between the product supplier team and the owner, contractor or subcontractor).
  • Question 19

5 out of 5 points

The A/E is responsible for informing the owner whether or not the design and project budget are in agreement.
  • Question 20

0 out of 5 points

The Critical Path Method (CPM) of project scheduling is described by all of the following EXCEPT:

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic Management

Authors: Richard Lynch

5th Edition

0273716387, 978-0273716389

More Books

Students also viewed these General Management questions