Answered step by step
Verified Expert Solution
Question
1 Approved Answer
The Foundational 15 (Algo) [LO2-1, LO2-2, LO2-3, LO2-4] [The following information applies to the questions displayed below.] Sweeten Company had no jobs in progress at
The Foundational 15 (Algo) [LO2-1, LO2-2, LO2-3, LO2-4] [The following information applies to the questions displayed below.] Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the year-Job P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, it estimated that 4,000 machine-hours would be required for the period's estimated level of production. Sweeten also estimated $26,200 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $2.00 per machine-hour. Because Sweeten has two manufacturing departments-Molding and Fabrication-it is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates: Total Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding 2,500 $ 10,750 $ 1.70 Fabrication 1,500 $ 15,450 $ 2.50 4,000 $ 26,200 The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Direct materials $ 16,000 Job P. Job Q $ 9,500 Direct labor cost $ 23,400 $ 8,700 Actual machine-hours used: Molding Fabrication 2,000 1,100 900 2,900 1,200 2,300 Total Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine- hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. Foundational 2-2 (Algo) 2. How much manufacturing overhead was applied to Job P and how much was applied to Job Q? (Do not round intermediate calculations.) Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine- hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. Foundational 2-2 (Algo) 2. How much manufacturing overhead was applied to Job P and how much was applied to Job Q? (Do not round intermediate calculations.) Job P Job Q Manufacturing overhead applied
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started