Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Tina's Material Company hauls gravel to a construction site, using a small truck and a large truck. The carrying capacity and operating cost per
Tina's Material Company hauls gravel to a construction site, using a small truck and a large truck. The carrying capacity and operating cost per load are given in the accompanying table. Tina must deliver a minimum of 120 cubic yards per day to satisfy his contract with the builder. The union contract with his drivers requires that the total number of loads per day is a minimum of 5. How many loads should be made in each truck per day to minimize the total cost? Capacity (yd) Small Truck Large Truck 30 Cost per Load $84 40 $72 In order to minimize the total cost, the number of loads in a small truck that should be made is and the number of loads in a large truck that should be made is 5
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started