Question

1 Approved Answer

Tools Needed MicroSoft Project Using MS Project, add the following summary tasks, tasks, resources, and durations. Add the summary tasks to the timeline. Set 3/5/18

Tools Needed

MicroSoft Project

Using MS Project, add the following summary tasks, tasks, resources, and durations. Add the summary tasks to the timeline. Set 3/5/18 as the project start date, and plan to complete the project as soon as possible. After you have input all of this information, please run a Work Overview Report (under Reports, Dashboards), print as a PDF and upload.

image text in transcribed

image text in transcribed

image text in transcribed

Data Tasks Work Resources Summary Tasks Phase A JMK-Network Design logical topology 2 days Administrator 70,000/yr.) Data Design, LLC. ($2000 paid on completion) Develop engineering drawings 5 days Phase B Sign off on eng. drawings 1 day RMC-IT Manager ($123,000 yr) 2 days JMK Develop Address Scheme Sign off on IPs 1 day RMC Pull cable Datacom, Inc. 13 days ($15,000 on completion) Phase C Terminate cable JMK 2 days 1 day Install outlets JMK Phase D JMK Install Telecom Server 1 day Spec and Order Router WICs 1 day JMK Phase E Install Softphone Software 1/2 day JMK Install Telecom Server Software 1/2 day JMK Phase F Add MAC and IP address reservations to Telecom Server 2 days JMK Test all softphone devices for connectivity to server 10 days JMK Phase G JMK Program Router to Gateway 1 day connections Add Telecom Bridging Equipment to rack, remotely 4 days program SIP gateway Test Bridging Equipment 1 day Datacom, Inc. Datacom, Inc. Phase H JMK Verify internal connectivity to 2 days all softphone endpoints Perform audit of dial sets. 7 days JMK Phasel Perform final testing of complete system 9 days JMK Data Tasks Work Resources Summary Tasks Phase A JMK-Network Design logical topology 2 days Administrator 70,000/yr.) Data Design, LLC. ($2000 paid on completion) Develop engineering drawings 5 days Phase B Sign off on eng. drawings 1 day RMC-IT Manager ($123,000 yr) 2 days JMK Develop Address Scheme Sign off on IPs 1 day RMC Pull cable Datacom, Inc. 13 days ($15,000 on completion) Phase C Terminate cable JMK 2 days 1 day Install outlets JMK Phase D JMK Install Telecom Server 1 day Spec and Order Router WICs 1 day JMK Phase E Install Softphone Software 1/2 day JMK Install Telecom Server Software 1/2 day JMK Phase F Add MAC and IP address reservations to Telecom Server 2 days JMK Test all softphone devices for connectivity to server 10 days JMK Phase G JMK Program Router to Gateway 1 day connections Add Telecom Bridging Equipment to rack, remotely 4 days program SIP gateway Test Bridging Equipment 1 day Datacom, Inc. Datacom, Inc. Phase H JMK Verify internal connectivity to 2 days all softphone endpoints Perform audit of dial sets. 7 days JMK Phasel Perform final testing of complete system 9 days JMK

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Medical Image Databases

Authors: Stephen T.C. Wong

1st Edition

1461375398, 978-1461375395

More Books

Students also viewed these Databases questions