The second floor of a light manufacturing building is constructed from a 5-in.-thick stone concrete slab with

Question:

The second floor of a light manufacturing building is constructed from a 5-in.-thick stone concrete slab with an added 4-in. cinder concrete fill as shown. If the suspended ceiling of the first floor consists of metal lath and gypsum plaster, determine the dead load for design in pounds per square foot of floor area.

-4 in. cinder fill – 5 in. concrete slab ceiling