Montoya-Weiss Engineering (MWE) is a Dallas engineering firm that produces customized instrumentation for the aerospace industry. MWE
Question:
Montoya-Weiss Engineering (MWE) is a Dallas engineering firm that produces customized instrumentation for the aerospace industry. MWE is thinking about outsourcing the production of a particular component to a Fort Worth manufacturer. The Fort Worth manufacturer has offered to make the components for a price of $25 each, based on an annual volume of 32,000.
However, additional costs are associated with maintaining this supplier relationship. MWE management has developed the following cost figures:
In addition to cost, MWE management has identified two other dimensions to consider:
quality (specifically, the percent of defect-free items) and on-time delivery. MWE management has established importance weights of 0.2, 0.5, and 0.3 for cost, quality, and on-time delivery, respectively. Finally, purchasing experts at MWE have rated the performance of the current assembly operation and the Fort Worth manufacturer with regard to these three dimensions.
Their ratings (1 “poor” to 5 “excellent”) are as follows:
Calculate the total cost of each option, as well as the overall preference score.
Step by Step Answer:
Introduction To Operations And Supply Chain Management
ISBN: 9780131791039
2nd Edition
Authors: Cecil C. Bozarth, Robert B. Handfield