3. Develop a list of materials needed and a design for routing those materials to determine the actual cost. Until a prototype is built, tested, redesigned, and rebuilt that meets acceptable criteria, the costs are estimated. Only when there is a clear set of inputs should the vendor-supply chain be determined and final costs calculated.