Product P is composed of three subassemblies: K, L, and W. Subassembly K is assembled using 3

Question:

Product P is composed of three subassemblies: K, L, and W. Subassembly K is assembled using 3 Gs and 4 Hs; L is made of 2 Ms and 2 Ns; and W is made of 3 Zs. On-hand inventories are 40 Gs, and 200 Hs. Scheduled receipts are 10 Ks at the start of week 3 and 30 Ks at the start of week 6.
One hundred Ps must be shipped at the start of week 6, and another 100 at the start of week 7. Manufacturing lead times are two weeks for subassemblies and purchase lead times are one week for the components. Final assembly of P requires one week for 100 units. Include an extra 10-percent scrap allowance in each planned order of G. The minimum order size for H is 200 units. For other items, use lot-for-lot ordering. Develop each of the following:
a. Tire product structure tree.
b. The material requirements plan for P, K, G, and H.
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Operations Management

ISBN: 978-0071091428

4th Canadian edition

Authors: William J Stevenson, Mehran Hojati

Question Posted: