The production process at ABC Manufacturing is as shown in the following figure: A product in this
Question:
A product in this production process needs to go through only one of the painting operations:
1. Which one of the operations in the previous figure is a bottleneck operation?
2. If Orion Manufacturing operated 8 hours/day, 25 days/month, what is the monthly capacity of the companys production process?