Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A manual assembly line is to be designed to make a small consumer product. The work elements, their times, and precedence constraints are given
A manual assembly line is to be designed to make a small consumer product. The work elements, their times, and precedence constraints are given in the table below. The workers will operate the line for 400 min per day and must produce 300 products per day. A mechanized belt, moving at a speed of 1.25 m/min, will transport the products between stations. Because of the variability in the time required to perform the assembly operations, it has been determined that the tolerance time should be 1.5 times the cycle time of the line. (a) Determine the ideal minimum number of workers on the line. Assume Tr = 0. (b) Use the Kilbridge and Wester method to balance the line. Assume M = 1.0. (c) Compute the balance delay for your solution in part (b). Element 1 HN 2 3 4567 8 9 10 Time Te 0.4 min 0.7 min 0.5 min 0.8 min 1.0 min 0.2 min 0.3 min 0.9 min 0.3 min 0.5 min Preceded by: 1 1 2 2,3 3 4 4,9 5,6 7,8
Step by Step Solution
There are 3 Steps involved in it
Step: 1
To determine the ideal minimum number of workers for the assembly line and balance the line using th...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started