Question: Determine the loads acting on beams B1 and B2 and columns C1 and C2 located at ground floor. Distributed superimposed design dead load over
Determine the loads acting on beams B1 and B2 and columns C1 and C2 located at ground floor. Distributed superimposed design dead load over the slab is w 5 kN/m. Note that this is a 5 story structure. [5 Points] 4 m 5m + 4.5 m C1 6 m C2 B1 B2 5.5 m FigQ4