Answered step by step
Verified Expert Solution
Question
1 Approved Answer
It has been decided to sidetrack a well from 1500 ft. The sidetrack will be a build and hold profile with the following specifications:
It has been decided to sidetrack a well from 1500 ft. The sidetrack will be a build and hold profile with the following specifications: TVD of Bottom of Hole: Horizontal departure: Build up Rate: Calculate the following: (a) Radius of curvature (b) Drift angle of the well. 10000 ft. 3500 ft. 1.5 per 100 ft. (b) TVD, MD and horizontal departure at the end of buildup section (c) TVD, MD and horizontal departure at the midpoint of buildup section (d) TVD, MD and horizontal departure at the midpoint of tangent section (e) Length of the arc and length of tangent (f) Total measured depth to the target.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Solutions Step 1 To calculate the requested parameters we need to make some assumptions regarding the angle of the build section and the length of the ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started