Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

one eight-hour shift, 750 nondefecrive parts are desired from a fabrication operation. The standard time for the operation is 15 minutes. Because the machine operators

one eight-hour shift, 750 nondefecrive parts are desired from a fabrication operation. The standard time for the operation is 15 minutes. Because the machine operators are unskilled, the actual time it takes to perform the operation is 20 minutes, and, on average, one-fifth of the parts that begin fabrication are scrapped. Assuming that each of the machines used for this operation will not be available for one hour of each shift, determine the number of machines required

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

OM4 operations management

Authors: David Alan Collier, James R. Evans

4th edition

1133372422, 978-1285701011, 1285701011, 978-0357228739, 978-1133372424

More Books

Students also viewed these General Management questions