Answered step by step
Verified Expert Solution
Question
1 Approved Answer
please help 4) [5 pts] A production process at OU Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously
please help
4) [5 pts] A production process at OU Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the folding and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Assume that demand is very large. a) [2 pts] Identify the bottleneck activity. (e.g., Folding, Sanding, Drilling, Welding, Assembly) Sanding b) [2 pts] Fill in the blank (do not forget your measurement units) c) [1 pts] We assumed that demand is very large in this case, but now let's assume that demand is very small, say demand is 1 unit/hr. How would this affect bottleneck time and throughput time? Choose one out of three options (up, down, no change) for each sub-question below. a. Bottleneck time: Up Down No change b. Throughput time: Up Down No change Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started