Answered step by step
Verified Expert Solution
Question
1 Approved Answer
DISCRETE EVENT SIMULATION Coursework Assignment Create the model and optimise the profit for the plant described in the following. You need to simulate ten days
DISCRETE EVENT SIMULATION Coursework Assignment Create the model and optimise the profit for the plant described in the following. You need to simulate ten days operation after an appropriate warm-up period. Description A manufacturing plant that produces gearboxes has to be designed and optimized. Each gearbox is composed of the following components: two gears, two bearings, and one casting. Gears are manufactured in a separate plant and arrive via a 20 m conveyor belt, according to a time distribution defined in the excel file or any appropriate distribution of your choice (such as a uniform distribution between 1 to 2.5 minutes). The conveyor is of a belt type, and gears have a footprint of 80 by 80 by 100 mm, and can be spaced on the conveyor 100 mm apart. The maximum capacity of the conveyor is 180 parts, and the speed is 5 m/min
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started