Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

DISCRETE EVENT SIMULATION Coursework Assignment Create the model and optimise the profit for the plant described in the following. You need to simulate ten days

DISCRETE EVENT SIMULATION Coursework Assignment Create the model and optimise the profit for the plant described in the following. You need to simulate ten days operation after an appropriate warm-up period. Description A manufacturing plant that produces gearboxes has to be designed and optimized. Each gearbox is composed of the following components: two gears, two bearings, and one casting. Gears are manufactured in a separate plant and arrive via a 20 m conveyor belt, according to a time distribution defined in the excel file or any appropriate distribution of your choice (such as a uniform distribution between 1 to 2.5 minutes). The conveyor is of a belt type, and gears have a footprint of 80 by 80 by 100 mm, and can be spaced on the conveyor 100 mm apart. The maximum capacity of the conveyor is 180 parts, and the speed is 5 m/min

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamentals Of Quality Control And Improvement

Authors: Amitava Mitra

5th Edition

1119692334, 978-1119692331

More Books

Students also viewed these General Management questions

Question

1. Follow directions the first time.

Answered: 1 week ago